In general, the process begins with the assembly of the base of the tower, then the first section is placed, with the diagonals that join it to the base and a part of the basal ballast, then the slide is installed on top of it. locate the tower head and the cabin.
Then the counter jib are placed. The final counterweight is mounted and more basal ballast is added. New sections are installed with the help of the boom of the
tower crane until reaching its final height.
Another way to increase the height is by means of a system in which the tower-cabin-head unit is smaller in section than the rest of the shaft. The new section that has an open side is superimposed on the tower surrounding the upper unit.