Tower crane positioning needs to be considered for easy removal

Author: youke Time: 2022-05-20

There are three main principles of tower crane positioning:
1. Meet the construction needs, and avoid construction blind spots as much as possible.
2. At the initial installation height of the tower crane, the rotatable components such as the boom and balance arm can rotate as far as possible without touching the surrounding trees, existing buildings and other solid structures.
3. The positioning of the tower crane should be considered to facilitate the removal of the tower crane.